Projects & References
Every delivery follows the same documented path: waste assessment, heat balance, factory acceptance test, supervised installation and commissioning. Here is what a AIBIN project includes — and how to verify it.
Documentation set
Each project ships with the waste-characterization record, the heat-balance calculation, general-arrangement drawings, the FAT protocol and the emission-compliance dossier for your regulator.
Supervised installation & commissioning
Our engineers supervise civil works interfaces, equipment assembly, refractory curing and first burn — then train your operators on-site.
References on request
Because industrial clients often prefer discretion, we share project references, photos and commissioning data directly — ask for references in your market and sector.
Ready to size your unit?
Send your waste characterization and we return a technical proposal within days, not weeks.